IATF 16949 certified harness plant · Hebi, China

Quality: every loom is tested, and you get the record

A wiring harness fails silently. There is no noise before a bad crimp opens under vibration, so inspection has to be electrical, not visual. Every unit we ship is tested against the drawing, and the test record travels with the carton.

IATF 16949PPAP-lite documentationLot traceability

The eight gates

100% electrical testContinuity, short-circuit, mis-wire and pin-out verification against the approved drawing on automatic testers rated to 2,400 points. No sampling — every unit.
Crimp integrityCrimp height measurement and pull-force test per batch, recorded against the terminal specification. A loose crimp is the number-one field failure cause in aftermarket looms.
Hipot & insulation resistance3000 V AC dielectric test and >200 MΩ insulation resistance at 1000 V DC on high-voltage assemblies; shielded cores verified for 360° shield continuity.
Bend & flex300,000-cycle bend test on hinge-loop sections (tailgate, door, sliding door) before a design is released.
VibrationRandom vibration per IEC 60068-2-64 on chassis and engine-bay assemblies to catch conduit chafe and terminal fretting.
Thermal cycling-40 °C to +125 °C cycling on engine-bay looms; insulation shrinkage and terminal relaxation are checked afterwards.
Salt sprayNeutral salt spray per ASTM B117 on chassis and rear-body looms destined for winter-salt or coastal markets.
Water ingressIP67 verification on sealed connectors and pass-throughs; splash test on underbody branches.

Environmental and functional labs

Thermal chambers, humidity cabinets, salt-spray and vibration rigs run the qualification plan behind every new part number — the same labs that qualify parts for production programmes. Functional benches then verify the assembled unit: continuity, insulation, dielectric strength and circuit resistance against the approved drawing, 100% of production.

Environmental test laboratory: thermal chambers, humidity and salt spray cabinets
Environmental lab — thermal cycling, humidity and salt-spray qualification.
Functional test benches verifying harness continuity and dielectric strength
Functional lab — 100% electrical verification before packing.

Traceability

Each harness carries a label with part number, revision, build date, operator ID and test result. Wire lot and terminal lot are recorded against that label, so a field return can be traced back to the reel it came from. If a batch problem appears, we can tell you exactly which units are affected instead of recalling everything.

Documentation supplied with each order

  • Approved drawing, circuit list and connector list (yours to keep)
  • Electrical test record per unit
  • Crimp pull-test record per batch
  • Material declaration: RoHS / REACH on request, ELV statement for EU shipments
  • Certificate of origin and HS code declaration for customs

What we do not do

We do not sell genuine OEM parts, and we do not claim another maker's part numbers as our own. Aftermarket looms are built to OEM fitment and circuit specification under the same IATF 16949 system that runs our production-line programmes. If a customer needs a genuine OEM part, we say so — an honest no costs less than a return.

Send the drawing. Get a quote and a sample date inside 24 hours.

Email a photo of the OEM label, a pin-out or the old loom itself. Our engineers will confirm fitment, circuit count and connector family, then send a quote and a sample date within 24 hours. Samples ship in 7–10 days; production takes 25–30 days.

WhatsApp Email